Getting On The Air

Parks on the Air (POTA) in India: Current Operational Status and Pathways for Participation

#pota #field-ops #analysis #data #presentation #india #vuland #hamfest

Reading time: 9 minutes
View Presentation
An accompanying presentation is available for this post.

Hamfest India 2026, NITK Surathkal, Mangaluru (28–29 November 2026).

Complete details, interactive charts and data tables are in the accompanying post: Status of POTA in India

Introduction

Why this study?

Approach

List of active parks

Active licensed operators

Limitations

Park Distribution and Activation Status

Map of POTA parks in India

Figure 1: Geographical distribution of unactivated and activated POTA sites

Where are the activations?

State / RegionParksActivatedActivations
West Bengal261532
Karnataka151028
Madhya Pradesh131318
Tamil Nadu6211
Maharashtra1736

The long tail

Activation tierParks
Unactivated141
1 activation30
2 to 516
6 to 104
11+0

A few parks do the heavy lifting

Lorenz curve of park activations

Figure 2: Lorenz curve of lifetime activations by park rank

Cumulative POTA activations in India since 2021

Figure 3: Cumulative growth of POTA activations in India

Year by year

YearActivation attemptsCumulative
202122
20222830
20231747
20243077
202525102
2026217123

Operator Demographics and Effort

481 active HF operators

Data sourceFoundUnique
Logbook of The World (LoTW)323+323
Parks on the Air (POTA)49+25
CQ contests247+53
IARU HF Championship70+21
ARRL contests69+6
Reverse Beacon Network (24h)69+48
PSKReporter (24h)12+4
WSPRnet (monthly archive)5+1
Total, de-duplicated481

Only 19 have attempted an activation

Butterfly chart of unique parks against total attempts per activator

Figure 4: Exploration (unique parks) against total activation effort

General vs. Restricted

Box plot of successful activations for VU2 and VU3 operators

Figure 5: Comparison of General and Restricted grade license holders

Adjusting for the outlier

MetricGeneral (all)General (w/o VU2UCR)Restricted
Operators9810
Total attempts702953
Successful652439
Mean successful7.23.03.9
Median successful1.01.03.0

Geographic Footprint and Exploration

Polar chart of activation bearing and distance from each operator's QTH

Figure 6: Travel distance of operators

Hunter Dynamics

Bar chart of top hunters and a donut chart of the domestic and DX split

Figure 7: Domestic and international hunters of Indian POTA activations

World map of confirmed QSOs with Indian parks

Figure 8: Geographic distribution of hunters of Indian POTA activations

Hypotheses for Low Activity

Regulatory friction and access

Equipment, culture and people

A Practical Approach for New Activators

  1. Check the site: buffer zone, local authorities, wildlife paths, hazards
  2. Prepare the go-bag: modular, weather-proof, a dry bag for electronics
  3. Before heading out: pre-test equipment, print license and WPC notices, spot on pota.app
  4. Before getting on the air: deploy safely, check SWR, involve the community
  5. Wrap up: Leave No Trace, upload logs, a souvenir for participants

QRP back-pack with two radios, two antennas and test equipment

Figure 9: Author’s QRP back-pack with two radios, two antennas and misc. test equipment

zBitx next to a campfire at IN-0067

Figure 10: My own little bonfire while I activate IN-0067 (Tadoba)

EFHW wire hoisted into a tree at IN-0067

Figure 11: Top anchor of the EFHW radiating element at IN-0067

Field operations site in the rain at IN-0189

Figure 12: Lovely little location in the mountains, IN-0189 (Brahmagiri)
PC: One of the group members

Station table under the trees at IN-0194

Figure 13: The chosen site and EFHW deployment at IN-0194 (Bananthimari)

Vertical antenna being tested at IN-0194

Figure 14: Deploying the vertical on-site for testing at IN-0194

Radio display at night during the IN-0194 activation

Figure 15: The station goes online in horrible conditions! IN-0194

Checklists for Field Operations

Checklist 1 of 5

Figure 16: Step 1: Things to check at the shortlisted site

Checklist 2 of 5

Figure 17: Step 2: Preparing the back-pack

Checklist 3 of 5

Figure 18: Step 3: Checks before heading out

Checklist 4 of 5

Figure 19: Step 4: Things to do before getting on the air

Checklist 5 of 5

Figure 20: Step 5: Final wrap-up and Leave No Trace

Preparing a Station for POTA Operations

QRPickle: A Field Companion

Animated tour of the QRPickle screens

Figure 21: A tour of the QRPickle screens

Discussion and Future Work

Future work

Update: What has changed since July?

July vs. November 2026

Metric9 Jul15 NovChange
Parks listed191196+5
Parks activated5057+7
Unactivated parks141139−2
Successful activations104116+12
Activation attempts123138+15
Activators1920+1
Hunters142154+12
Hunters who are DX71%68%−3 pts

Highlights

But the skew continues

Errata

Corrected in the camera-ready version of the paper:

SectionReadsShould read
II-BSpotting networks “over the most recent 24 hour period”RBN and PSKReporter: 24 hours; WSPRnet: May 2026 monthly archive
III-AU.S.: 11,966 parks, “each of them” activatedAlmost 12,000 parks, most activated at least once
III-ATop 4 parks: 30 of 104 activations, “30%”28.8%
III-A“No park … more than eleven times”more than ten times

Errata (continued)

SectionReadsShould read
III-CPOTA operators discovered: “29”49 (as in Table II)
III-C“19 individuals have successfully activated”19 attempted; 17 had a successful activation
III-DFig. 5 note: “six activators”five activators
III-E142 huntersAt least 142: leaderboards list only 5 hunters per park
ReferencesFAQ URL truncated at “…Service-Rules-”…Service-Rules-2024.pdf

Acknowledgment and Data

Thank you!


  1. https://docs.pota.app/docs/rules.html (Last accessed: 10 Jul 2026). ↩︎

  2. https://k4fmh.com/2026/01/26/a-snapshot-of-u-s-pota-sites-activators-and-activations/ (Last accessed: 09 Jul 2026). ↩︎

  3. National Wildlife Data Center, https://v1.wii.gov.in/nwdc_aboutus (Last accessed: 13 Jul 2026). ↩︎

  4. https://hfi2026.nitk.ac.in/participants (Last accessed: 09 Jul 2026). ↩︎

  5. RBN and PSKReporter are 24-hour snapshots; WSPRnet is the May 2026 monthly archive. ↩︎

  6. Parks are ranked from 1 (most activated) to 191 (least activated), and the cumulative share of activations is plotted against the rank. ↩︎

  7. As of 9 Jul 2026. By 15 Nov 2026, 2026 had 36 attempts, making it the most active year so far. ↩︎

  8. An activation needs 10 QSOs on a single UTC day. Attempts with fewer QSOs are counted as unsuccessful. ↩︎

  9. License classes in India have changed several times; the prefix is used as a heuristic. ↩︎

  10. Location data is behind paywalls on proprietary platforms, so only HamQTH is used. ↩︎

  11. The POTA park leaderboard lists at most 5 hunters per park, so this counts hunters who appear in a park’s top 5. The true number of hunters is higher. ↩︎

  12. DoT memorandums and FAQs clarify that carrying amateur radio equipment on domestic flights is permitted: https://arsi.info/wp-content/uploads/2024/12/Frequently-Asked-Questions-on-the-Telecommunication-Amateur-Service-Rules-2024.pdf ↩︎

  13. See https://youtu.be/MZzqekrGJtI and https://www.facebook.com/VU2UUU (Last accessed: 15 Jul 2026). ↩︎

  14. See https://www.youtube.com/@Harisriramaiah/videos for activations with an elaborate station by VU2UCR (Last accessed: 15 Jul 2026). ↩︎

  15. See https://youtu.be/-dt-KXlIckg for challenging conditions and engagement activities by VU3KOX (Last accessed: 15 Jul 2026). ↩︎

  16. Activations, attempts and activators for both dates were computed from the 15 Nov 2026 snapshot. Cutting that snapshot off at 9 Jul 2026 reproduces the paper’s numbers exactly. Hunter counts cannot be cut off by date, so the July hunter figures are from the paper. ↩︎

↪ Respond by Email .